Cost and Profit Optimisation Sets in CAT DILR Explained

A DILR set that asks you to maximise profit or minimise cost under several limits can look like linear programming, and it sends people reaching for algebra they half remember. You do not need linear programming. You need one idea from it: the best answer sits at a corner of the feasible region, so you only have to test the corners.
This piece explains corner-point thinking in plain language, works two examples with every number checked, and covers the places where these sets go wrong, such as integer constraints and objectives that change halfway through the question list.
Optimisation sets are table-heavy, so reading data fast matters. The DI tables practice questions build that reading speed.
- Each constraint is a boundary. Together they enclose a region of allowed choices.
- The best profit or cost sits at a corner of that region, not in the middle.
- List the corners, compute the objective at each, and pick the best.
- When the profit numbers change, the winning corner can change, so rerun the corner check.
- Integer-only quantities need a final check of whole-number points near the corner.
What a Constraint Actually Does
A constraint is a limit on how much of something you can use or make: machine hours, labour hours, raw material, demand. With two products, each constraint cuts off part of the possible combinations. What is left after all the cuts is the feasible region, the set of production plans that obey every limit.
The key insight is geometric but you do not need to draw anything for it to help. When profit rises steadily as you make more of each product, you always push production outward until some limit stops you. A plan in the interior of the region can always be improved by pushing further, so the best plan is on the boundary. Push along the boundary and you reach the corner where two limits bind together. That is where the optimum lives.
Worked Example: Maximising Profit
A factory makes products A and B. Each unit of A earns a profit of 40 and each unit of B earns 30. Machine time is limited to 100 hours, with A using 2 hours and B using 1 hour per unit. Labour is limited to 70 hours, with each unit of A and B using 1 hour. Demand for A is capped at 40 units.
Write the limits as 2A plus B at most 100, A plus B at most 70, and A at most 40, with both quantities non-negative. Now list the corners by intersecting the boundaries that matter.
| Corner (A, B) | How it arises | Profit 40A plus 30B |
|---|---|---|
| (0, 0) | Nothing made | 0 |
| (40, 0) | A at its demand cap | 1,600 |
| (40, 20) | Demand cap meets machine limit | 2,200 |
| (30, 40) | Machine limit meets labour limit | 2,400 |
| (0, 70) | Labour limit with no A | 2,100 |
The best is 2,400 at 30 units of A and 40 units of B. Check it: machine time is 60 plus 40, which is 100, labour is 30 plus 40, which is 70, and demand for A is 30, within the cap. A nearby plan such as 35 of A and 30 of B uses 70 plus 30 machine hours, which is exactly 100, and 65 labour hours, and it earns only 2,300, so the corner does beat its neighbour.
Choosing the plan that uses the most of one resource and stopping. Using the most machine time is not the aim. The aim is profit, and a plan that exhausts only one limit often leaves value on the table. At the optimum here, two limits bind together.
Why the answer is where two limits meet
Profit per machine hour is 20 for A and 30 for B. Profit per labour hour is 40 for A and 30 for B. A is better per labour hour and B is better per machine hour, so neither product wins on both. That tension is the sign that the best plan uses both products and exhausts both resources, which is exactly what the corner at 30 and 40 does. When one product beats the other on every scarce resource, you tend to find a plan that uses only that product up to a limit.
The Objective Can Move the Optimum
Optimisation sets love a follow-up question that changes a number. The same factory now earns 20 on each unit of A and 30 on each unit of B. The corners do not move, because the constraints are the same, but the winner may.
| Corner (A, B) | Profit 20A plus 30B |
|---|---|
| (0, 0) | 0 |
| (40, 0) | 800 |
| (40, 20) | 1,400 |
| (30, 40) | 1,800 |
| (0, 70) | 2,100 |
Now the best is 2,100 at 0 of A and 70 of B. The optimum jumped from one corner to another because B became much more attractive relative to A. The lesson is practical: do not reuse an old optimum after a parameter changes. The corners are reusable, so recompute only the last column.
Build the corner table once and keep it. Follow-up questions in the same set usually change the profit numbers or one limit. If you keep the corner list and the arithmetic column separate, a changed number costs you thirty seconds rather than a restart.
Worked Example: Minimising Cost
A buyer must purchase two inputs, X and Y, at costs of 3 and 4 per unit. Needs are: X plus Y at least 10, 2X plus Y at least 14, X at least 2, and Y at least 3. The region now extends outward without a ceiling, but because costs are positive, the cheapest plan is still at a corner, and it is the one closest to the origin.
Intersect the boundaries. The two joint-need lines meet at X equal to 4 and Y equal to 6. The minimum on X sits at X equal to 2, where Y has to be at least the larger of 8 and 10, which is 10, giving (2, 10). The minimum on Y sits at Y equal to 3, where X has to be at least the larger of 7 and 5.5, which is 7, giving (7, 3).
| Corner (X, Y) | Cost 3X plus 4Y |
|---|---|
| (2, 10) | 46 |
| (4, 6) | 36 |
| (7, 3) | 33 |
The minimum is 33 at X equal to 7 and Y equal to 3. Check feasibility: 7 plus 3 is 10, so the first need is met exactly, and 14 plus 3 is 17, comfortably above 14. A neighbouring whole-number plan such as (6, 4) costs 34, which is higher, so the corner stands.
For a minimisation with positive costs, scan the corners nearest the axes first. The cheapest plan is usually where you buy the least of the expensive input and the cheapest input covers the need. Checking those corners first shortens the table.
Integer Constraints and Awkward Corners
Some sets say that quantities must be whole numbers, or give a lot size such as batches of 10. Then the corner may not be a whole-number point. The fix is to move to the whole-number points nearest the corner and compare them.
- Compute the corner and its objective value, which gives an upper bound on profit.
- List the whole-number points close to the corner that satisfy every constraint.
- Compute the objective at those points and take the best.
- Confirm no other corner, after rounding, beats it.
This is a small search, often three or four points, and the corner value tells you how close you can possibly get. If a rounded point lands just below the corner value, it is probably the answer.
A Small Integer Example
Suppose a single resource of 20 hours is shared between A and B, with A using 3 hours per unit and B using 2 hours, and profits of 7 for A and 4 for B. Units must be whole numbers. Per hour, A earns 7 over 3, which is about 2.33, and B earns 2, so A is better. The corner puts all the time into A, which is 6.67 units and a profit of about 46.67.
That is not allowed, so look at the whole-number points near it. Six units of A uses 18 hours and leaves 2, enough for one unit of B, giving a plan of 6 and 1 with a profit of 46. Five units of A and 2 of B earns 43, and 4 of each earns 44. Since the corner gave an upper bound of 46.67 and profits here are whole numbers, 46 is the best possible, and you can stop searching.
How to Read an Optimisation Set Quickly
Most of the time in these sets goes into setup, so organise it before you compute.
- Name the decision quantities first, and give them short labels.
- Write each limit as one line of the form usage at most capacity.
- Find the corners by intersecting pairs of binding boundaries, and discard any that break another limit.
- Compute the objective in a single column and circle the best.
- Re-read the question to see whether it asks for the best plan, the best value, or something derived.
The last step matters more than it looks. Some sets ask for the number of units of one product at the optimum, or the leftover capacity, or the profit if one limit is relaxed by 10. Computing the best value and answering the wrong thing is a common slip.
Optimisation sets reward patience in the setup stage and speed in the computing stage. Candidates who rush the setup lose the set to a misread limit. Candidates who go carefully through the limits find the arithmetic is small. If the table is clean, the rest is ten additions.
Where These Sets Fit in Your Selection
An optimisation set has a clear, learnable structure, which makes it a good candidate for early selection if you recognise the pattern. The risk is a set with six constraints and three products, where the corner list becomes long. In that case, the structure is the same but the effort is higher, and it may not be the best use of your time. Sizing the set before you commit is a skill in itself.
Build the habit by solving a few sets at a time. A weekly plan in the CAT preparation planner can hold a DILR block each week, and a strategy review can tell you whether the block is large enough. The CAT percentile predictor helps you see how one extra solved set moves your overall target.
Summary
Optimisation sets do not need linear programming. Turn each limit into a boundary, find the corners where two limits bind, compute the objective at each corner and pick the best. Interior plans can always be improved, so the answer lives on the boundary.
Keep the corner list so you can rerun the last column when the profit or cost numbers change, handle integer constraints by checking whole-number points near the corner, and read the final question carefully. A clean table is most of the battle.
Get Faster at Reading Tables
Optimisation sets start with a table. Reps on data reading cut the setup time.
Practise DI TablesFrequently Asked Questions About Cost and Profit Optimisation Sets
Do I need linear programming for DILR optimisation sets?
No. You need the corner idea: the best profit or cost lies at a corner of the region allowed by the constraints, so you only have to evaluate the corners.
How do I find the corners?
Intersect pairs of binding constraint boundaries, then discard any intersection that violates another limit. What remains are the corners of the feasible region.
What if the quantities must be whole numbers?
Compute the corner first, then check the whole-number points nearest to it that satisfy every constraint, and take the best of them.
What if the profit numbers change in a follow-up question?
Keep the same corners and recompute the objective column. The best corner may change, so do not reuse the old answer.
Practice DILR sets, chapter by chapter
CAT DILR practice across LR puzzles and DI sets, each with a worked solution.
More from DILR
Continue reading

When a CAT DILR Set Collapses: A 3 Step Bail Out Rule

When to Abandon a CAT RC Passage: The 4 Minute Rule

SNAP 2026 Registration Closes 25 Nov: Finish Tonight

CAT RC on Philosophy and Literature: Find the Skeleton
Put it into practice